{"id":6552,"date":"2025-12-18T19:47:48","date_gmt":"2025-12-18T22:47:48","guid":{"rendered":"https:\/\/urbembr.com\/projetos\/leo-pais-leme\/"},"modified":"2025-12-18T19:47:48","modified_gmt":"2025-12-18T22:47:48","slug":"leo-pais-leme","status":"publish","type":"projeto","link":"https:\/\/urbembr.com\/en\/project\/leo-pais-leme\/","title":{"rendered":"Leo Pais Leme"},"content":{"rendered":"<p><span data-contrast=\"auto\">To celebrate Leo Madeiras\u2019 80th anniversary, the Pinheiros store in S\u00e3o Paulo received a new high-performance mass timber structure, supplied and erected by Urbem. The project represents the company\u2019s first in-house assembly, consolidating its position as a provider of complete solutions for the construction industry. <\/p>\n<p> <\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n<p>The expansion included new storage areas and administrative spaces, featuring a <span data-contrast=\"auto\"><b>glulam (glued laminated timber)<\/b><\/span> <span data-contrast=\"auto\">structural system engineered to support high loads and span up to 12 meters, all without interrupting the store\u2019s daily operations. More than 1,000 timber elements were used, totaling 148 m\u00b3 and contributing to the sequestration of approximately 115 tons of CO\u2082. <\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n<p>With a compact construction site, on-site assembly, and a dedicated team, the project was completed in just 90 days<span data-contrast=\"auto\">, highlighting the logistical efficiency and precision of the prefabricated system. The design also incorporates complementary materials such as drywall and cement boards, demonstrating the versatility of mass timber in hybrid construction solutions. The project stands as a clear example of structural performance combined with a commitment to more sustainable construction practices.  <\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n","protected":false},"featured_media":5737,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false},"categoria-do-projeto":[133],"class_list":["post-6552","projeto","type-projeto","status-publish","has-post-thumbnail","hentry","categoria-do-projeto-commercial"],"acf":[],"_links":{"self":[{"href":"https:\/\/urbembr.com\/en\/wp-json\/wp\/v2\/projeto\/6552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/urbembr.com\/en\/wp-json\/wp\/v2\/projeto"}],"about":[{"href":"https:\/\/urbembr.com\/en\/wp-json\/wp\/v2\/types\/projeto"}],"version-history":[{"count":0,"href":"https:\/\/urbembr.com\/en\/wp-json\/wp\/v2\/projeto\/6552\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/urbembr.com\/en\/wp-json\/wp\/v2\/media\/5737"}],"wp:attachment":[{"href":"https:\/\/urbembr.com\/en\/wp-json\/wp\/v2\/media?parent=6552"}],"wp:term":[{"taxonomy":"categoria-do-projeto","embeddable":true,"href":"https:\/\/urbembr.com\/en\/wp-json\/wp\/v2\/categoria-do-projeto?post=6552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}